We design innovative projects

Planco S.A. is a growing construction company of new private and public projects with specialization in repairs and reinforcement of existing constructions. With activity in all areas of construction, civil engineering, building, plumbing, electromechanical, energy-industrial, with the introduction of know-how from abroad as well as export to third countries.

5
Major Constructions

in Corfu Island

Planco Blueprints

70

Employees

120000

Builted (sq.m)

5000

Visitors stayed

About Us

Our Projects

Construction & Supervision,

Villa flamingo

Construction and supervision Steel metal construction with (EIFS) exterior insulation finishing system Natural Greek stone finish

View Project
Construction & Supervision,

Sandy Villas

[video poster="https://planco.gr/web-assets/uploads/2018/08/planco-corfu-constructions-sandy-villas-02.jpg" mp4="https://planco.gr/web-assets/uploads/2018/08/planco-corfu-constructions-sandy-villas.mp4" muted="true"][/video]   Featuring 94 suites and rooms including modern design in dining options. Moreover, the design and implementation of this project make the perfect combination of separate beach section and tailor-made services, so guests can enjoy their unique holidays.

View Project
Construction & Supervision, Project Management,

House Construction

This project included the dismantling of the roof and the construction of a metal skeleton floor with galvanized sheet metal 1mm. The roof will be lined with gypsum board and waterproofing and thermal insulation, while the roof is made with tile panels. The lining of the walls was made of cement board, while the whole surface was made using an external thermoprocessing system STOTHERMCLASSIC.

View Project
Construction & Supervision, Project Management,

Mayor La Grotta Verde

The project consisted of the construction of 114 rooms of metal skeleton with galvanized sheet metal. The lining of the walls was made of double gypsum plasterboard, while decorative elements were made of expanded polystyrene EPS. The exterior surface of the building was made using the external thermal insulation system STOTHERMCLASSIC.

View Project
Energy Sustainability, Project Management,

Agios Georgios

The first stage of the project consisted of the construction of 144 rooms of metal skeleton with galvanized steel sheet of 1 mm. The lining of the walls was made with double gypsum plasterboard, and decorative elements were made of expanded EPS polystyrene as well as various external architectural elements were created. The exterior surface of the building was made using the external thermal insulation system STOTHERMCLASSIC. In the new stage of the project, our company has undertaken to build 90 suites and 16 villas. The construction will be made of metal skeleton with galvanized sheet metal of 1 mm. The lining of the walls will be made of double gypsum plasterboard, and decorative elements of expanded polystyrene EPS The exterior surface of the building will be made using the external thermal insulation system STOTHERMCLASSIC.  

View Project
Construction & Supervision, Project Management,

Corfu Holiday Palace

Construction of 8X4X1 prefabricated swimming pool with spatula coating and overflow on one side.

View Project
Project Management,

Paleo ArtNouveau

The first stage of the project involved the renovation of 14 bungalows as well as the construction of private prefabricated pools and a large communal pool. The refurbishment of the bungalows included the universal dismantling of the rooms and their rebuilding as well as the construction of an electromechanical installation based on the new energy saving devices. The bathroom was constructed with decorative mosaic coating of the company STOTHERMCLASSIC, while the sinks were constructed with decorative EPS (expanded polystyrene) as well as various exterior architectural elements. Outside of the bungalows, routes were created with lighting and automatic watering.   The second stage of the project concerned the refurbishment of 175 rooms. Work included renovation of bathrooms, furniture painting and wardrobe construction respectively in 175 rooms as well as wall masonry and construction of electromechanical installation.

View Project

Our Clients