Mayor La Grotta Verde
Construction & Supervision
Description
The project consisted of the construction of 114 rooms of metal skeleton with galvanized sheet metal.
The lining of the walls was made of double gypsum plasterboard, while decorative elements were made of expanded polystyrene EPS.
The exterior surface of the building was made using the external thermal insulation system STOTHERMCLASSIC.