Agios Georgios
Energy Sustainability
Description
The first stage of the project consisted of the construction of 144 rooms of metal skeleton with galvanized steel sheet of 1 mm. The lining of the walls was made with double gypsum plasterboard, and decorative elements were made of expanded EPS polystyrene as well as various external architectural elements were created. The exterior surface of the building was made using the external thermal insulation system STOTHERMCLASSIC.
In the new stage of the project, our company has undertaken to build 90 suites and 16 villas. The construction will be made of metal skeleton with galvanized sheet metal of 1 mm. The lining of the walls will be made of double gypsum plasterboard, and decorative elements of expanded polystyrene EPS The exterior surface of the building will be made using the external thermal insulation system STOTHERMCLASSIC.